5aa05f140d37db78b27ef64eb1fd0838805845a4
1
Commits
| Author | SHA1 | Message | Date | |
|---|---|---|---|---|
|
|
0b4f306ed1 |
rtx-fea: reduced Newmark (mor::dynamic) + the phase-4a offline replay — the ≥10x gate is REFUTED by measurement at the validated resolution
Performance Benchmarks / Run Benchmarks (push) Canceled after 0s
CI / Format Check (push) Canceled after 0s
CI / Clippy Check (push) Canceled after 0s
CI / Build (macos-latest) (push) Canceled after 0s
CI / Build (ubuntu-latest) (push) Canceled after 0s
CI / Test (macos-latest) (push) Canceled after 0s
CI / Test (ubuntu-latest) (push) Canceled after 0s
CI / Build CPU-Only (Explicit) (push) Canceled after 0s
CI / Python Bindings (maturin) (macos-latest) (push) Canceled after 0s
CI / Python Bindings (maturin) (ubuntu-latest) (push) Canceled after 0s
CI / WASM Build + Size Check (push) Canceled after 0s
CI / Distributed Training Tests (push) Canceled after 0s
CI / CI Success (push) Canceled after 0s
Documentation / Build API Documentation (push) Canceled after 0s
Documentation / Build User Guide (push) Canceled after 0s
The dynamic layer over ReducedNonlinearModel: reduced consistent mass V'MV (full element sum, never ECSW-sampled — ECSW weights are trained on internal-force virtual work and would conserve the wrong inertia), reduced_force_and_jacobian exposed (solve() refactored onto it), and ReducedNewmark mirroring NonlinearDynamicStepper::newmark_newton in reduced coordinates (same predictor, residual, tangent shape; no rescue ladder by design — a reduced Newton death is a finding). TDD (tests/reduced_newmark.rs): identity-basis march reproduces the full stepper to 2.4e-14 over 15 steps (both Newton loops tightened to 1e-10 so only solver rounding separates them); rigid-translation reduced mass = rho*A to 1e-9; a 6-mode POD basis tracks its training trajectory at 4.2e-4 rms against a 1.0e-4 projection floor. Phase 4a (fsi3_ecsw_offline.rs, fsi3_reduced_newmark_replay, env-gated): reduced Newmark replay of the harvested FSI3 trajectory at record cadence (dt_rec = 5x march dt), driven by the recorded end-of-step loads. Measured, m=12/20: - COST (dt-independent, the verdict): 3,068/3,580 us/step at 4.6/5.0 Newton iters — 2.0-2.3x the banded full-order structural step (7,200 us/pass, bandedlu_fsi3_ny62_t85). The >=10x gate needs <=720 us/step; one reduced eval alone costs ~640 us because phase 2 refuted hyperreduction (every eval loops all 70 elements). The gate arithmetic is closed: reduced Newton needs >=2 evals, capping the ROM at ~5x. THE CAMPAIGN GATE (pinned cycle bands at >=10x structural speedup) CANNOT BE MET at the validated resolution. - TRACKING at record cadence diverges in the release transient (dies t=4.35-4.45) — and the RTX_REPLAY_IDENTITY control dies EARLIER (t=4.13) in the exact subspace: the death is the 5x-coarse integration + aliased loads, NOT the reduction. The record-cadence replay cannot judge subspace dynamics; the projection floor (1.1e-3 at m=12) remains the honest subspace statement. Campaign verdict to be recorded in omni-cortex in the pre-registered words. Co-Authored-By: Claude Fable 5 <[email protected]> Claude-Session: https://claude.ai/code/session_01X2GmJXeQ2njUecEKiJZ1G2 |